Grupo Aeroportuario Del Pacifico
Bovis (Coordinadora)

What did we do?

Landside Façade Remodeling
Erpe-Puente Conector (International Exit), Volumetrics, Catalog and Base Budget, 4.241,00 m2

Landside Facade, Volumetrics, Catalog and Base Budget, 5.385,00 m2

Roads
Landside Facade, Volumetrics, Catalog and Base Budget, 3.200,00 m2

Phase 2 Body B, D-1 and D-2, Volumetry, Catalog and Base Budget, 6.500,00 m2